On November 29, 2021, the service agreed upon with the manufacturer of the SRM was provided. Repair of the consistent lubrication system (AUTOMATIC GREASE DOSING (AGD) SYSTEM) for the Pellet Mill was performed. The distribution unit was restored to operation in accordance with the original diagram.