A visual inspection of the equipment was carried out to ensure correct installation. Commissioning work was carried out in accordance with the manufacturer’s requirements. The equipment was put into operation in accordance with the contractual parameters.
Information about the customer’s equipment:
Sizer, year of manufacture 2020
Date of work:
June 16–17, 2020